Tax Democracy

ATECO code 25.11.00

Manufacture of metal structures and parts of structures

FABBRICAZIONE DI STRUTTURE METALLICHE E PARTI ASSEMBLATE DI STRUTTURE

ATECO code25.11.00

ATECO 2007 code — superseded in ATECO 2025

This code was remapped to:

  • 25.11.00Fabbricazione di strutture metalliche e di parti di strutture metalliche(corrispondenza diretta)

Recommended INPS scheme:

SEPARATA

Flat-rate scheme (forfettario)

Eligible for the flat-rate scheme?

Yes

Threshold:

€85,000

Profitability coefficient:

67%

Classification

  • CATTIVITÀ MANIFATTURIERE
  • 25FABBRICAZIONE DI PRODOTTI IN METALLO (ESCLUSI MACCHINARI E ATTREZZATURE)
  • 25.1FABBRICAZIONE DI ELEMENTI DA COSTRUZIONE IN METALLO
  • 25.11Fabbricazione di strutture metalliche e di parti di strutture
  • 25.11.00Fabbricazione di strutture metalliche e parti assemblate di strutture

Frequently asked questions

A metalwork shop making industrial sheds, beams, and trusses: ATECO code 25.11.00 or site-installation work?
25.11.00 if you manufacture frames, beams, trusses, bridges, industrial frameworks, and prefabricated metal buildings. This code covers the production of structures, not on-site assembly and erection work. If your main activity is windows and door frames, use 25.12.10 instead.
I manufacture metal greenhouses and tensile structures: does this fall under 25.11.00 or under wood and plastic codes?
25.11.00 when greenhouses and tensile structures are predominantly metal, as the code description states. If the greenhouse is mainly wood, the code is 16.23.09; if it is mainly plastic, it is 22.24.09.
I manufacture metal scaffolding, formwork, and shoring for construction sites: 25.11.00 or an equipment-hire code?
25.11.00 if you manufacture metal scaffolding, formwork, and shoring: the code lists them explicitly among metal structures. Hiring out or erecting that equipment on site are activities distinct from manufacturing. If your product is metal doors, windows, or gates instead, the code is 25.12.10.
I weld structural beams and then powder-coat them in-house: is all of this covered by 25.11.00?
Yes — welding the structure and applying the final coating remain within 25.11.00 when they are part of manufacturing the piece. Coating or galvanising third-party parts on a subcontract basis is a separate metal-treatment activity. Hot forging and hot stamping of semi-finished products, however, fall under 25.40.00.

Calculate taxes, deductionsand contributions on your own!

Calculate income tax, contributions, other income and deductions together in the simulator.

Start now